Ultimate Scaffold & 750mm uPVC Hoarding Fence Solution

TIME:2026-06-04 14:47:52

Ultimate Scaffold & 750mm uPVC Hoarding Fence Solution for Construction Sites

I. System Overview

The 750 series uPVC hoarding fence is an upgraded solution over the traditional 500 series, optimizing design to reduce material waste and carbon emissions. Designed for modern engineering demands, this system provides a comprehensive solution balancing sustainability, installation efficiency, and structural integrity.

upperunions-construction-750mm-uPVC-hoarding-site-fence.jpg

II. Why Choose Our 750mm uPVC Hoarding Fence Solution?

  • Health & Safety Focus (CDM Regulations): The weight of a single main panel is only 3.53 kg/m, keeping the total panel weight under 8.5 kg. This is far below the 20kg maximum single-person lifting weight limit recommended by the UK HSE, meaning no heavy lifting machinery is required and manual handling risks are dramatically reduced.  

  • Eco-Friendly & Chemical Compliance: Manufactured with an eco-friendly formula, the system is 100% compliant with EU and UK RoHS directives. It is completely free of heavy metals such as lead and cadmium, as well as Substances of Very High Concern (SVHC).  

  • Fire Safety Classification: Delivers outstanding performance in flame spread and smoke development, achieving Euroclass EN 13501-1: B-s2, d0 and US Standard ASTM E84: Class B.  

  • Extreme Weather Resistance: Equipped with a super weather-resistant formula backed by a 10-year anti-aging warranty.  

III. Core System Components

Main Panel System (UU 750-01): With a total width of 750mm and a main wall thickness of 1.2mm, a single panel achieves an effective area of 1.8 m². This represents a 50% increase in coverage area compared to traditional 500mm panels, sharply reducing the need for system connecting clips by 30.3%.  

Smart Corner System (UU 750-02): Features a unique soft-hard co-extrusion design utilizing soft PVC. It enables stepless adjustment from 45° to 180°, breaking free from traditional 90° limitations to accommodate complex construction terrain.  

Trim System (UU 750-03): Engineered with compatible end caps featuring a long/wide span design to effectively resolve issues related to water and dust ingress.


IV. Integrated Scaffold & Installation Solutions

To ensure smooth deployment, we provide professional test reports and 3D simulated construction guidance drawings. Standard unit assembly actions have been heavily optimized, shortening labor installation time by 20%.

Ground Screw Foundation System: The heavy-duty EU/US compliant version is ideal for urban infrastructure and high wind pressure areas. It integrates seamlessly with standard scaffold components, utilizing 48.3mm Q235 pipes, fixing clamps, and putlog couplers. This setup withstands winds up to 25.5 m/s (UK BS EN Standard) and 70 mph 3-second gusts (US ASCE Standard).  

Cement Pier Foundation System: A traditional setup suitable for compliant municipal projects, capable of resisting a maximum ultimate wind pressure of 578 Pa (10.578 KPA). 

upperunions-construction-750mm-uPVC-hoarding-fence-installation.jpg

V. Streamlined Supply Chain & Delivery

Our optimized packaging solutions significantly lower carbon footprints. Through spatial optimization, a single container covers 3,069 m², reducing maritime transportation carbon emissions by 14.8%. We guarantee a 72-hour order response and maintain a swift 4-day production lead time for a 40HQ container, ensuring your project timeline stays on track with highly efficient FOB Qingdao dispatch.